Non-Compliance Inspection Report

  • JP
  • Dec 20, 2016
  • 1 min read

During 2016 MPMC experienced exceedances of Total Suspended Solids and Copper at HAD03, the effluent discharge location after the water treatment plant.

The Ministry of Environment did complete a number of inspections, post non-compliance.

The actions required by the inspection are:

- Continue to source water directly from Springer Pit to the extent practicable.

- Reduce the overall volume of water being stored on site.

- Complete review of treatment potential from Springer Pit.

- Complete bench-scale testing for water treatment plant optimization for Total Cooper removal and implement optimization if feasible.

Please click here for the 12th August 2016 report.


 
 
 

Comments


Featured Posts 
Recent Posts 

© 2023 by the Concerned Citizens of Quesnel Lake. Proudly created with Wix.com

  • Facebook Clean Grey
  • Instagram Clean Grey
  • Twitter Clean Grey

All images on the CCQL website are taken in around Quesnel Lake by CCQL Members

bottom of page